In collaboration with Universal Construction and Maintenance (https://upcg.au)
Vonlec was engaged to deliver a complete electrical and communications scope for the fit-out of The Skin Cancer Hub. The project required precision installation, strict compliance with healthcare facility standards, and seamless coordination to ensure operational readiness within a live clinical setting.
The electrical scope was primarily focused on operating and consultation rooms, with works including:
This infrastructure was designed to meet healthcare compliance standards while allowing for future technological expansion.
Installation of a Molex CAT6 structured cabling system, providing reliable data transfer, robust connectivity, and scalability for future technology integration. The system was seamlessly integrated into the existing network to ensure consistent performance with minimal downtime.
Implementation of LED lighting tailored to clinical environments, delivering bright, uniform illumination to support medical tasks and enhance patient comfort. The system incorporated energy-efficient fittings to reduce operational costs and ensure compliance with relevant healthcare and building standards.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.