Central Petroleum – Gas Processing Plant Generator Replacement
Location: Mereenie, Northern Territory
In collaboration with Slade Industries
Vonlec delivered the electrical installation and generator replacement works for the upgrade of two 700kVA gas-powered generators at the Central Petroleum Gas Processing Plant in Mereenie, NT. This critical infrastructure project required precision installation, compliance with strict safety protocols, and seamless integration to ensure uninterrupted power supply within a high-risk, live processing environment.
Scope of Works
- Generator Decommissioning & Removal – Safe disconnection and removal of existing generator units under Central Petroleum’s permit-to-work procedures and lock-out/tag-out safety systems.
- High-Capacity Generator Installation – Precise positioning and installation of two 700kVA gas generators to enhance the facility’s power capacity and energy resilience.
- Complete Electrical Integration – Full installation of associated switchgear, control systems, and power distribution infrastructure for seamless operation.
- Testing & Commissioning – Rigorous system verification to ensure compliance, reliability, and operational efficiency.
Key Outcomes & Value Delivered
- Safety & Compliance Assurance – All works delivered under Central Petroleum’s strict safety standards and compliance framework.
- Enhanced Energy Reliability – Upgraded generator systems increased power supply security and operational resilience.
- Seamless Project Delivery – Meticulous planning enabled integration without disruption to gas processing operations.